1. If installing on existing valve flush valve thoroughly prior to installing Odor Contol Unit (OCU)
  2. Thread or couple valve assembly to Combination Air Valve.
  3. Put cinder blocks on floor of structure where OCU is to sit to prevent water from coming in contact with carbon bed.
  4. Measure distance from outlet of OCU valve assemble to approximate connection point for OCU.
  5. Cut unfinished end of hose to length and finish cut end with Cam lok adapter supplied with kit.
  6. Screw threaded end of hose into valve assembly and use Cam lok quick connect to OCU.
  7. Check once a month to see when odor problem returns then replace OCU buy calling number on top of OCU.
Home  Product Specs  Installation   Contact Us