|
|
- If installing on existing valve flush valve thoroughly prior to installing Odor Contol Unit (OCU)
- Thread or couple valve assembly to Combination Air Valve.
- Put cinder blocks on floor of structure where OCU is to sit to prevent water from coming in contact with carbon bed.
- Measure distance from outlet of OCU valve assemble to approximate connection point for OCU.
- Cut unfinished end of hose to length and finish cut end with Cam lok adapter supplied with kit.
- Screw threaded end of hose into valve assembly and use Cam lok quick connect to OCU.
- Check once a month to see when odor problem returns then replace OCU buy calling number on top of OCU.
|
|